Skip to main navigation Skip to search Skip to main content

Schedule compliance operating curves and their application in designing the supply chain of a metal producer

Research output: Journal contributionsJournal articlesResearchpeer-review

22 Citations (Scopus)

Abstract

Schedule compliance is one of the main logistic objectives of production systems. In order to achieve high schedule compliance, different control variables of a job shop production system can be adopted. This paper focuses on the relationship between such control variables in make-to-order processes. It provides a quantitative model to describe the effect of safety time as well as the impact of lateness distribution of the production system on schedule compliance, stock level of finished goods and delivery time. Furthermore, the applicability of this model is demonstrated by describing the results of an industry project. In this project, the model was applied to design the supply chain of a metal manufacturer to increase the capability to produce on time.
Original languageEnglish
JournalProduction Planning Control
Volume25
Issue number2
Pages (from-to)123-133
Number of pages11
DOIs
Publication statusPublished - 25.01.2014
Externally publishedYes

Research areas and keywords

  • Engineering
  • Decoupling
  • Logistic
  • Logistic operating curves
  • Schedule compliance

ASJC Scopus Subject Areas

  • Industrial and Manufacturing Engineering
  • Strategy and Management
  • Computer Science Applications
  • Management Science and Operations Research

Fingerprint

Dive into the research topics of 'Schedule compliance operating curves and their application in designing the supply chain of a metal producer'. Together they form a unique fingerprint.

Cite this