Zur Hauptnavigation wechseln Zur Suche wechseln Zum Hauptinhalt wechseln

Construction of Container Terminal 4: Port of Bremerhaven, Germany

    Publikation: Beiträge in SammelwerkenAufsätze in KonferenzbändenTransfer

    Abstract

    All the expert forecasts predict that container throughput will double over the next ten years. If Bremerhaven – a seaport in the north of Germany – wishes to keep pace with these developments, the port facilities have to grow. In order to provide the urgently required space, bremenports had already extended the quay by 340 m a few years ago. Construction phase Container Terminal (CT) 3a, however, was just the prelude to the much more difficult project Container Terminal 4, which will create four new berths for mega container vessels. The terminal construction project will extend the riverside quay by 1681 m to a total usable length of 4720 m - the longest riverside quay in the world.
    OriginalspracheEnglisch
    TitelProceedings of the Third Chinese-German Joint Symposium on Coastal and Ocean Engineering, National Cheng Kung University Tainan, Taiwan
    Redakteure/-innenShan-Hwei Ou, Chia Chuen Kao, Tai-Wen Hsu
    Seitenumfang12
    ErscheinungsortTainan
    Herausgeber (Verlag)National Cheng Kung University
    Erscheinungsdatum2006
    ISBN (Print)957-986-00-7143-6
    PublikationsstatusErschienen - 2006
    VeranstaltungChinese-German Joint Symposium on Coastal and Ocean Engineering - CGJOINT 2006 - National Cheng Kung University, Tainan, China
    Dauer: 08.11.200616.11.2006
    Konferenznummer: 3

    Fachgebiete und Schlagwörter

    • Bauwesen und Architektur
    • Quay Walls, Containerterminals

    Fingerprint

    Untersuchen Sie die Forschungsthemen von „Construction of Container Terminal 4: Port of Bremerhaven, Germany“. Zusammen bilden sie einen einzigartigen Fingerprint.

    Dieses zitieren